My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-04-20_REPORT - M1993030
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1993030
>
2006-04-20_REPORT - M1993030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 8:38:42 AM
Creation date
11/27/2007 1:26:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993030
IBM Index Class Name
Report
Doc Date
4/20/2006
Doc Name
Annual Fee/Report/Map
From
Crystaljack Mining
To
DMG
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
azeas have been reclaimed on the Crystaljack properties except three excavations as <br />:sated in orange on the attached maps. These excavations currently tota10.1 acre. <br />reclaimed azea since 2004 which has 50% or better vegetation coverage is 0.04 <br />Growth is excellent. <br />other azeas, with the exception of the three open excavations, have been re-contoured <br />reseeded. All previously reclaimed excavations and prospects show excellent growth <br />ept for the most recent three prospects and small excavation at Site No. 2. <br />have been planted on previous excavations and prospects, particularly on the Two <br />claim. Most tree growth now approaches 4 feet. <br />x small excavations, totaling 0.033 acre, were opened using a John Deere 200 track <br />in 2004. All excavations were completely reclaimed by 6 June. <br />small hand-dug prospects and track hoe access points were also graded and <br />ned, bringing the total reclaimed acreage to 0,04 acre. <br />excavations were filled, re-contoured, and reseeded. Field checks in October of 2004 <br />2005 showed good growth. <br />.rations are planned to begin the first week of June and continue through August. We <br />work equipment between Glacier Peak Mining (M-2003-030) and Crystaljack <br />ing for a total of 60 days with a break mid season. We aze planning to use a John <br />re 690 track hoe. One existing excavation, No. 2 will be completed and 80% <br />simed. Two other excavations, No. 13 and No. 14, time permitting, will be opened <br />80% reclaimed. <br />time permitting, prospects 006 through 009 will be opened and evaluated for <br />ral potential. All will be filled and reclaimed at the end of the season unless one <br />s some mineral potential. <br />No. 6, on the Two Point will be opened to evaluate mineral potential and then <br />wrarily filled and reclaimed. <br />lion will continue into August with follow-up reclamation in October or as <br />Mechanized reclamation will be completed by the end of August. <br />
The URL can be used to link to this page
Your browser does not support the video tag.