Laserfiche WebLink
~_ ~':'.. <br />° ~o~i o~oo~oo~ooooo o~o~ o <br />999 <br />ALBERT R. r~xR1 <br />5650 East 88th Avenue <br />Henderson, Colorado 80640 <br />June 27, 1984 <br />Colorado Mined Land Reclamation Board <br />1313 Sherman Street, Suite 423 <br />Denver, Colorado 80203 <br />Gentlemen, <br />Re Albert R. Frei, Walstrum Mine <br />M.L.R. Permit No. 63-33, Annual Report <br />G3(~(~~~MC~D <br />JUL ~ 51984 <br />MINED LAND REClRA9dTI0N DWISION <br />Calo. Dept. of Natural Resources <br />Our files indicate that the anniversary date for this permit is <br />June 23. This is the first Annual Report due on this operation. <br />Mining activity during this first year have been limited <br />primarily to construction of the entrance road. Approximately <br />3.08 acres of the total area has been affected in construction <br />of this road. Some of the material removed during construction <br />was used in construction of the acceleration/deceleration lanes <br />required by the County and the State Highway Department. Please <br />refer to the Annual Report map for the location of areas discussed <br />in this report. <br />We will deal specifically with each of the Annual Report <br />questions as outlined in Section 2.41 of the Rules and Regulations. <br />2.41 (1) Construction of the entrance road in Stage 1 began <br />this year. Approximately 4.94 acres +/- has been disturbed <br />(see map, areas colored yellow). Of this area, 2.86 <br />acres +/- is used as a temporary storage location for <br />materials and for a scale house and scales (Stages <br />Pe & Pw) When mining has opened a larger work area, <br />material storage areas will be relocated in the mine <br />proper. <br />(2) No reclamation was required during this time period. <br />(3) Backfilling is the only reclamation performed. Partial <br />backfilling has been done in Stages Pe and Pw. See <br />