Laserfiche WebLink
• <br />~~ ~~ <br />-~ k <br />David C. Shelton <br />Director <br />June 1, 1982 <br />R ~ III III III IIIIIII III <br />S rprE OFCOLG °:•00 <'GC L-'!•? ', ,.. <br />D EPARTMEN7 OF ":ATURAL RESOURCES <br />D. Moore Pascu~ h recuhve Duector <br />NIINED LAt`dD RECLAI~~IATION <br />a23 Centennial Building, 1313 Sherman Street <br />Denver,Colorado 80203 TeL(303)866-3567 <br />Lloyd V "Buck" Barnhart <br />VALCO/Gunnison Concrete Division, <br />P.O. Box 837 <br />Gunnison, Colorado 81230 <br />P.e: File h81-14 <br />1L \~to,4/ <br />C'!L V <br />f~~~B~~~ <br />JUN ~ ~ 1982 <br />MINED LAND RECLAMATION <br />Colo. Dept. of Natural Resource <br />Based upon our records, the anniversary date of your mining operation. Perri t is <br />June 29 and annual fees for the year(s) 1982 total_'ir.g <br />S 350.00 are due on that date. Fees are based coon a schedule of <br />5350.00 if the opera ti or. is an open mining oceration of 10 acres or more and <br />5275.00 fcr any other operation 10 acres or more. <br />• <br />.41so, to bring the Division up to date as to the rv: ri ng and reclamation on the <br />site, please sunmit a report and map (to a scale of ^ot less than 100' to the <br />inch and not more than 660' to the i,:ch), indicbtirc the phases of `he reclama- <br />tion pi an which have been completed, correlated with t'~e timetable. The re_oort <br />ar.d map shall contain the following informatier.: <br />1) Location. and nur~w er of acres affected during that year, <br />2) Locatio.^.s and number of acres reclai.Ted for that year, <br />3) T,':e location and number of acres in the various stages of rec'anation <br />(backfilled, graded, topsoil replaced, revegetated), <br />4) The species of vegetation planted, t;^a locations and approxi ma to dares <br />of planting, <br />5) The type and aoproximate quantity of fertilizers, orcanic material or <br />soil conditioners used and location of use, <br />o) An appraisal of the success of reclamation efforts, and .n the event <br />of failure of any efforts, a short narrative on the suspected or deter,v:ned <br />causes or such failure, <br />7) Es ti mats of the location and number of acres to be affected 'n t5e <br />coming year, and <br />8) The effective date of the infor,-~stion provided above s,ha11 be ^o .more <br />than d5 days prior to the ann_'versary date. <br /> <br /> <br />