Laserfiche WebLink
R~ ~~ ~.~~-~Rf~ <br />i <br />DENuITYjPERMEAHILITY TESTS '?N LINER COVER <br />PHASE ONE AND TWO <br />SUMMARY <br />10-7-93 <br />TEST LOCATION/DESCRIPTION COMP. PERMEABILITY <br />PHASE TWO, ACRE 1 <br />175" EAST OF MAIN FMB. ABUTMENT 89.9 2.2X10-o(CM/S) <br />D-8 DOZER PLACEMENT ONLY <br />PHASE TWO, ACRE 8 <br />83" SOUTH OF PHASE 1/2 TIE-IN 98.1 1.9X10-6(CMiS) <br />HEAVY HAUL TRUCK TRAFFIC <br />PHASE ONE, ADJACENT TO ACRE 40 <br />20" NORTH OF PHASE 1/2 TIE-IN 100.0 .1.6X10-6(CM/S) <br />HEAVY TRAFFIC AT CONSTRUCTION <br />AND LIGHT TRAFFIC DURING OPERATION <br />PHASE ONE, ADJACENT TO ACRE 4 <br />100" NORTH OF PHASE 1/2 TIE-IN 95.6 2.9X10-6(CMiS) <br />INITIAL CONSTRUCTION TRAFFIC <br />ONLY <br />PHASE TWO 30" Nth OF ANCHOR - <br />TREC7CH ACRE 5, 8-INCHES FROM 3.1X10-6(CM/S) <br />THE SURFACE OF AREA PUSHED <br />BY DOZER ONLY (NO TRAFFIC) <br />GLENN'6~-DYER, :}RIB S~N~OF2 FIELD REPRESENTATIVE <br />