My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14161
DRMS
>
Back File Migration
>
Report
>
REP14161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:10 PM
Creation date
11/27/2007 1:23:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
10/18/1993
Doc Name
CONSTRUCTION STATUS REPORT SAN LUIS PROJECT TAILINGS DISPOSAL AREA PHASE I RAISE I
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' San Luis Project -Phase II Raise I Expansion Construction Sutus Report <br />' 4.4.1 Embanlmtent Raise Fill <br />The original specifications for construction of the embankment raise called for material Type 1 <br />' fill for constructing the raise as a homogeneous, mono-fill structure. The gradation limits for <br />material Type 1 have been revised to allow the use of material with slightly greater fines <br />(percent passing a No. 200 sieve) content. This material is similar in nature to the Type 2 <br />material used for the upstream face of the initial embankment. The following gradation limits <br />' have been adopted for the raise fill embankment material: <br />U.S. Standard Sieve Size 9o Finer By Weight <br />' '/e inch > 65 <br />q 4 45-95 <br />// 40 35-90 <br />11200 < 35 <br />Where in contact with the VLDPE liner at the ends of the embankment, the maximum allowable <br />' particle size for this material is Ith inches, elsewhere the maximum particle size is six inches. <br />In the event significant oversized material is encountered in fill material, as placed on the <br />embankment, this oversize is to be removed by working to the outside and inside face of the <br />' raise. <br />Embankment raise fill is being compacted to a minimum density of 85 percent of the maximum <br />' dry density (ASTM D-698). Development of a method specification to achieve this minimum <br />density has proven acceptable. Currently, the fill is placed in maximum three foot thick loose <br />lifts and compacted through trafficking by the Caterpillar Model 777 haul trucks with an empty <br />gross vehicle weight of approximately 65 tons. The haul truck traffic is routed to provide <br />' coverage of the fill. <br />4.4.2 Liner Cover/Drainage Blanket <br />Material Type 2 was specified for use as the liner cover/drainage blanket material in the <br />' Earthwork Technical Specifications (Appendix F of the Phase II, Raise 1 Design Report. The <br />variability of the borrow sources for Type 2 material is such that a readily available <br />October, 1993 7 SRK Project No. 14125 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.