Laserfiche WebLink
:`. <br />Annual Reclamation Report and Review <br />The mine's Annual Reclamation Report is also included in the AHR. <br />Below are the findings. <br />The report indicates that no backfilling and grading, topsoiling or <br />revegetation took place on the mine site in 1993. Inspections <br />verify this fact, except for minor amounts of the spoil being used <br />to cover the ash within 24 hours of disposal. <br />B Pit was reclaimed to ash grade using both available spoil on site <br />and surfacing the pit with clay mined from the B Pit. The clay met <br />EPA testing approval for RCRA Subtitle D qualifications for <br />landfills. <br />Conclusion <br />This concludes the Division's review of the Keenesburg 1993 Annual <br />Hydrology Report and Annual Reclamation Report. <br />Please respond to the Division's concerns about the Annual <br />Hydrology Report listed above as soon as possible. <br />Thank you for your cooperation. <br />S' ely, <br />a n E . S rith <br />Environmenta eclamation Specialist <br />knsbecor.94 <br />