Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 17 <br />Ctient: Bower Brothers Construction <br />Work Performed: <br />Date: 6/2 ~ /96 <br />Time: 3.0 <br />Mileage: 32 <br />Engr.ITech: JK <br />As requested, we visited the project site on this date and conducted nuclear density test No.'s 71 through 76 on <br />the material placed. The contractor advised us that a maximum 4' of fill material had been placed since our <br />previous visit. <br />We obtained moisture samples to be returned to our laboratory. A sample of waste coal was also obtained for <br />checkpoint Proctor determination. The checkpoint Proctor did not match any previous curves so a standard <br />Proctor with classification was performed, sample No. 5. <br />Remarks: <br />The material tested generally met project specifications with moisture contents being from 4.8% below to 4.4% <br />above optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Joe Bower of Bower Brothers Construction was notified of today's test results. <br />