My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14000
DRMS
>
Back File Migration
>
Report
>
REP14000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:04 PM
Creation date
11/27/2007 1:21:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
6/27/1996
Doc Name
QUARTERLY INSPECTION REPORT WASTE COAL AREA FOIDEL CREEK MINE ROUTT CNTY COLO
From
NORTHWEST COLO CONSULTANTS INC
To
BOWER BROS CONSTRUCTION
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 12 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 5/8/96 <br />Time: 2.0 <br />Mileage: 22 <br />Engr.lTech: JK <br />As requested, we visited the project site on this date and conducted nuclear density test No.'s 42 through 47 on <br />the material being placed. <br />The excavation contractor, Bower Brothers Construction, placed and compacted processed waste coal in the <br />Northeast area of the pile. We obtained 2 samples for checkpoint Proctor determination. We also obtained <br />moisture samples from all areas tested, to be returned to our laboratory. One sample did not match a previous <br />curve for this project, so a standard Proctor and classification was performed and will be designated as sample <br />No. 3 for this job. The other sample matched sample No. 3. <br />Remarks: <br />The contractor requested that we conduct nuclear density tests in an area previously tested to verify compaction. <br />We observed all materials tested on this date to be placed and compacted in a generally consistent manner. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was notified of today's test results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.