Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 15 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 5/20/96 <br />Time: 2.5 <br />Mileage: 40 <br />Engr.ITech: JK <br />As requested, we visited the project site on this date and conducted nuclear density test No.'s 56 through 58 on <br />the material placed. <br />The excavation contractor, Bower Brothers Construction, placed and compacted processed waste coal from Sta. <br />5+50 to Sta. 9+00, West of the Access Road. At the time of our visit, we observed the contractor plaang material <br />in the area of Sta. 9+00 to sta. 10+00. <br />We obtained moisture samples to be returned to our laboratory. <br />Remarks: <br />The material tested generally met protect specifications with moisture contents being 0.9% below to 2.2% above <br />optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was notified of today's test results. <br />