My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP13993
DRMS
>
Back File Migration
>
Report
>
REP13993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:04 PM
Creation date
11/27/2007 1:21:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988018
IBM Index Class Name
Report
Doc Date
8/7/1996
Doc Name
RECEIPT
From
DMG
To
MIDWAY SAND & GRAVEL INC
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> <br />..o.... <br />.o <br />,/wcv <br />i•iOlY <br />IM ~ <br />rwr /MMy IMNd <br />MINING PLAN FOR RECENTLY PERMITTED SOUTN PARCEL: <br />Mining activities will occur on the 21.90 acres as r clean up red <br />reclamation phase to finish that portion previously mined by pissed <br />owners. Also mining will begin on that portion of land approved by <br />the Board of County Commissioners on Mny 17, 1990. Mining will <br />basin on the central North aide end Northwnaterly portion, rad proee.: <br />South, West and East leaving that portion fronting Interstate 25 <br />undisturbed until the last phase of mining and reclamation. <br />Thn mining operation to be conducted will be a surface sand and grarrl <br />extraction'Operation, Thn operation will consist of stripping red sty <br />piling top eo11; removing the sand and gravel; leveling the mined are,. <br />and rn-vegetating in accordance with the enclosed reclamation plan, <br />Access to the proposed ever rill be provided Dy ealsting hrul voids <br />already locrted within Midway Sand 8 Gravel, Inc. The haul roads rill <br />ba eatehded as needed to the press being mined. The haul roads rill ~ <br />properly maintained by Midway Send 8 Grerel, Inc. during the life of i <br />operation, The haul distance from the mining site to the scale 1s <br />approalmately 3/4 to 1~ miles. <br />To alleviate any dust problems on the access roads, truck speeds rill <br />kept under fifteen miles per hour. All road surfaces am graveled. ~ <br />will use a venter truck with a spray bur to control any dust problem, <br />accordance with our existing mining plan. <br />The mining equipment to be used is all portable, and will not require <br />any public services ouch as rater, electricity, or gas. <br />All corners of said property am marked with a steel stake and ribbo~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.