My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP13990
DRMS
>
Back File Migration
>
Report
>
REP13990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:04 PM
Creation date
11/27/2007 1:21:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995021
IBM Index Class Name
Report
Doc Date
3/3/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~e~~ c~Y~Y <br /> • <br />• ck~ 4Y~~~ <br /> ~~~ is ~ ;~ <br />~ IIIIIIIIIIIIIIIIIII <br /> sss <br />Notice of Intent to Continue .•,..,.,.y Operations p ~+ ~/ RR,~ <br />c~1EV E~YEI..Y <br /> 110c Construction Materials Annual Report <br /> MAR 0 3 19~ <br />Permittee Name: Park County <br />Permit No. M-95-021 ~;ivisionofMineralS8GB01ogY <br />Operation Name: Chaparral Pit <br />Anniversary Date: April 24, 1998 <br />Total: $225.00 (Due on your Anniversary Date) <br />1. Contract Dates: (Far 111 permits only) Beginning date: <br />. Completion date: <br />2. a. PermiCted acreage: _ 9.9 b. County where mine is loc ated: <br />3. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />9. Does this mine operate MORE or LESS than 180 days per year? MORE LES <br />5. Does this mine have a phased reclamation plan? YES NO <br />6. Total acres affected during the report year:" ~ <br />7. Total acres reclaimed for the report year:" O <br />8. Total number of acres in topsoil replacement stage: ~ <br /> a. Average thickness of topsoil replaced: 0 <br />9. Total number of acres seeded: <br /> a. List species seeded & seeding rate for report year on back <br />10. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* <br />11. Estimated total acres to be affected in the next report year:' ~8~ <br />12. CObAtENTS: <br /> <br />* Please show the location of the acreage for items 9 - 6 on your map" . Indicate the <br />phases of the reclamation which have been completed, correlated with your timetable. <br />** NOTB: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~ ~r Date: 02 - ~ ~ ~ 9~ <br />Please type or print cur/rent conta/~ct name, mailing address, and phone number below: <br />Contact Name: /id-ry~o¢.~J~ ~-e~ Phone: (7/ % )836 - ~/~ 8-3 <br />/' ~ /~ FAX N0: (FII Y ) 8.3 6 - ~-~ 75 <br />Company: ~ p~s ~jtYt~/ `r ~vYt/10-2 <br />Address: //_/~• /~/~J ~~ITTT O <br />~D~/y0 <br />Federal Tax ID No. or Social Security No.: /~ ~- b DOD - ~,3 •~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.