Laserfiche WebLink
RECEIVED <br />Deremo Snyder Annual Report <br />2002-loos JUL 0 2 2003 <br />Division ~f Minerals and Geology <br />The petroleum contaminated soils (PCS) treatment area was tilled during the summer <br />months of 2002. Most of the mine spoil pile azeas were re-seeded and portions of the <br />south and west slopes of the Bigler Mine spoils pile were covered with excelsior matting. <br />In conformance with the reclamation plan, the D-2 shaft was closed with a locking gate, <br />and the D-2 facility was fenced. <br />During the coming yeaz, Umetco expects that the PCS will be either treated during the <br />summer months, or the treatment area will be reclaimed. Portions of the D-1 mine spoils <br />pile that experienced erosion aze scheduled to be repaired and re-seeded. <br />A site map is not included because there have been no significant changes at the site. <br />During the yeaz, two technical revision applications were approved, and an acreage <br />reduction request was approved for the release of 24.31 acres. <br />