Laserfiche WebLink
v~r <br />SUMMARY OF 2006 ACTIVITIES DEC 0 8 2006 <br />.inic,; Inc 06i'ety <br />Active mining continued at the new mine during the year. Reclamation hydro- <br />seeding was completed on an additional total of 2.0 acres. This involved seeding of <br />"stepped out" ore depleted zones the active mine. There are no changes to the Old Mine <br />map designated "Exhibit A" included in the 2003 report so it is not included again with <br />this year's submittal. <br />Road construction work was completed on the new access road into the amended <br />permit area north east of the existing mine. Construction on all five sediment control <br />ponds is now complete. Development work was also started on the mining plateau for the <br />new area. <br />The portion of Eagle County Road #51 which serves as a haul road was treated <br />with a lignosite dust suppressant. Road base material was replaced on worn areas of the <br />road at that time. <br />2006. <br />Approximately 614,000 tons of gypsum rock were shipped from the mine during <br />3 <br />