Laserfiche WebLink
Table 6-18 <br />DATA SUMMARY OF LINED POND ACCESS TUBES <br />Date Waste Pond Process Pond <br />gad gpad feet gad gpad feet <br />1999 January 2.6 <1 2.0 19.2 6.5 0.48 <br />February 2.94 <1 1.68 23.1 7.7 0.92 <br />March 3.69 <1 1.58 22.7 7.6 1.0 <br />April 3.77 <1 1.64 22.5 7.5 0.54 <br />May 4.4 <1 1.42 23.5 7.8 0.32 <br />June 4.2 <1 2.15 26.0 8.8 0.27 <br />July 3.2 <1 3.5 30.6 10.2 0.3 <br />August 2.4 <1 3.8 78.8 26.3 0.36 <br />September 1.7 <1 4.4 34.9 11.6 0.63 <br />October 1.3 <1 5.1 50.6 16.9 0.88 <br />November 1.4 <1 5.25 29.6 9.9 0.95 <br />December 1.3 <1 5.23 29.9 10.0 1.0 <br />• <br />2000 January 1.3 <1 4.86 28.1 9.4 .98 <br />February 1.3 <1 4.23 40.5 15.0 .6 <br />March 1.2 <1 3.8 40.5 13.5 .35 <br />April 1.4 <1 3.98 45.0 15.0 .42 <br />May 1.58 <1 4.44 33.0 11.0 .OS <br />June 1.37 <1 4.84 34.7 11.6 .18 <br />July 1.3 <1 6.04 35.5 11.8 .38 <br />August 1.4 <1 7.85 57.8 19.3 .1 <br />September 1.3 <1 8.24 36.7 12.2 .1 <br />October 1.7 <i 8.38 33.5 11.2 .2 <br />November 1.2 <1 7.9 39.6 13.2 .07 <br />December 1.9 <1 7.65 35.5 11.8 0.2 <br />' Nde: gpd = gallons Per day 9f~ = 9allans per acre per day <br />feet = Fn~oard in Waste Pend measured from tap d s1aH gauge, Process Pond measured fran tap d the cross owe (Process <br />to vr~te pond) <br />82 <br />• <br />