Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />i <br />1 <br />1 <br />1 <br />1 <br />NCIG -1992 HYDROI.O('Y REPORT <br />3.0 PROJECT WATER BALANCE <br />3.1 Vulcan Ditch <br />rags a <br />Flow in the Vulcan Ditch began in May, 1992 and continued through <br />September, 1992. Since the mine operation was suspended throughout <br />1992, all water diverted by the Vulcan Ditch was used exclusively <br />for agricultural purposes. Diversions to the ditch were as listed <br />below: <br />May - September, 1992: -1,300 Ac-Ft <br />Total: -1,300 Ac-Ft <br />3.2 Agricultural Oses <br />As stated above, all diversions from the Vulcan Ditch during 1992 <br />were for agricultural purposes. <br />3.3 Mine Dses <br />The Coal Ridge Number 1 Mine did not use any water during 1992 <br />since operations were in temporary suspension. No discharges were <br />made by the mine during this time period. <br />Mlrhad J. G~oMV! 7992 Oydrv7og~ Rtport <br />Jaom) 31, l993 NCIC, lwc. <br />