Laserfiche WebLink
HOLNAM ING <br />Fort Collim Plant • <br />48'18 N. UerlanE Trail <br />PO Bv<1548 <br />LaPorte, CO 80535 <br />Phone'9]0~81-x085 <br />Fax B70J82-1383 <br />HOLNAM <br />+.., .. <br />Qr <br /> <br />Oivisic <br />... Syr <br />October 10. 2000 <br />Ms. Barbara Chiappone <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Shemtan Street, Room 215 <br />Denver, CO 80203 <br />Reference: Boettcher Gypsum Quarry - Permit # M-77- 346 <br />Dear Ms. Chiappone, <br />Attached is the 2000 Annual report and a check in the amount of $688.00 for the <br />Boettcher Gypsum Quarry. The fee is for the reporting period of October 10, 194)9, to <br />October 10, 2000. <br />There was no activity at the Boettcher Gypsum Quarry during the reporting period as the <br />quarry is currently under cessation. <br />There are currently no plans to resume operations in the near future. <br />Per the requirements of 2CCR 407-1, 407-4, and Rules 1.15(1)(a), attached please find <br />a copy of the existing Bond in the amount of $38,000. <br />If you should require any additional information, please do not hesitate to call me at <br />(970) 482-4065 ext. 289. <br />Sincerely, <br />~/rI~ r ~ ~_ ~^' <br />~~ Michael B. Toelle <br />Quarry Superintendent <br />cc: Juan Nunez <br />Roy Steinmier <br />Britney Guggisberg <br />