Laserfiche WebLink
I• <br />PROJECT WATER BALANCE <br /> <br /> <br /> <br />• <br />• <br /> <br /> <br /> <br />VULCAN DITCH <br />Flow in the Vulcan Ditch began May 5, 1994 and continued to October 31, 1994. All water <br />diverted by the ditch was used for agricultural purposes only. <br />Records maintained by the Division Engineer show that diversions were made for May 5, 1994 <br />through October 31, 1994, with a total of 1,899.4 AF diverted <br />MINE USES <br />The Coal Ridge No. 1 Mine did not use any water during 1994. <br />Respectfully submitted: <br />R URCE ENGINEERING, INC. <br />-, <br />Paul S. Bussone, P.E. <br />Water Resource Engineer <br />PSB/mmm <br />447-1.0 nra,oreoo«.aa~ <br />l~ <br />David L. Smith <br />Engineering Technician <br />2 <br />~ ..... <br />""'RESOURCE <br />..... <br />..... <br />~~~~~ E N G i N E E R i N G I N C <br />