Laserfiche WebLink
Lambert ana ~~,~ociateg <br />• CONSULTINGC~OTECN NIC AL ENGINEERS AND MATERIAL TESTING <br />DATLY t'IELD RE^O RT <br />PR~•.IECT NUMBER M90016 MC DrY'I'I: 5/14/90 Monday <br />PRO,;ECT MAME West Elk Cowl <br />PROJECT LOCATION Somerset, CO <br />CLIENT West Elk Coal CompJiny <br />COtJT RACTOR West Elk Coal Company <br />WORK PERFORMED BY LAMBER4 AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />TECHNICIAN D. Dostaler <br />WEATHER CONDITIONS partly Cloudy, <br />windy <br />WORK RF.O UESTED Density Tests <br />FOREMAN Mr. Mike Price <br />I arrived at the project site at 3:00 pm as requested by <br />Ms. Kathy Welt. I performed soil moisture content and soil <br />• <br />density tests as requested by Mr. Mike Price of material being <br />,~,Jasfe. <br />placed on w3~teF gob pile using nuclear soil density test <br />methods. please refer to the test results sheet for approximate <br />test locations and test results. The test results were. <br />verbally given to Mr. Mike Price at the time of our site <br />visit. The test locations were determined by Mr. Mike Price. <br />The test results indicate only the relative compaction and <br />soil moisture content of the material tested at the elevation <br />and location tested at the time of bur site visit. <br />• <br />P O. BCX 3966 <br />GRAND JUNCTION. CO 61502 <br />1303) 2456506 <br />P.O. BOX 0045 <br />MONTROSE. CO 8 t 402 <br />(3031 249 21 54 <br />463 TURNER. 104 A <br />DURANGO. CO fit 301 <br />(30312595095 <br />