My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP13525
DRMS
>
Back File Migration
>
Report
>
REP13525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:47 PM
Creation date
11/27/2007 1:14:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Report
Doc Date
1/31/2001
Doc Name
1998 AND 1999 ANNUAL HYDROLOGY REPORTS AND 1999 ANNUAL RECLAMATION REPORT EAGLE NO 5 AND 9 MINES PN
From
DMG
To
RAG EMPIRE CORP
Permit Index Doc Type
ANNUAL RECLAMATION REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Require- <br /> Require- ment <br />Requirement ment complied Comment <br /> citation with ? lyes <br /> / no) <br />Y. Prevention of <br />adverse <br />impacts to CDMG Compliance with the Basic Standazds for ground water, as <br />ground water regulation yes explained in item W, above, indicate the permit[ee is preventing <br />systems 4.05.11 adverse impacts to ground water systems outside the permit area. <br />outside the <br />ermit area <br />Z. Prevention of <br />impacts to <br />ground CDMG The postmining land uses of rangeland/wildhfe, pastureland, and <br />water that regulation cropland will not use ground water. Consequently, any impact to <br />adversely s yes ground water will not impact the postmining land use in the <br />impact the 4.05.1(2) <br /> <br />postmining <br />and permit azea. <br />land use 4.05.11 <br />within the <br />emit area <br />AA. Minitniza <br />tion of <br />disturbance <br />to the <br />CDMG The disturbance to the hydrologic balance within and adjacent to <br />hydrologic <br />regulation <br />es the permit area caused by mining and reclamation at the Eagle <br />balance <br />4.05.1(1) y Mines is the minimum that can be expected from an <br />within and underground mining operation at this location. <br />adjacent to <br />the permit <br />area <br />BB.Prevention of <br />Mining and reclamation at the Eagle Mines, so far, have not <br />material caused impacts to the hydrologic balance outside the permit <br />damage to the CDMG area. The probable hydrologic consequences (PHC) section of <br />hydrologic regulation yeS the permit application projects future impacts to be minor, but <br />balance 4.05.10) the PHC may need updating. A PHC update will be addressed <br />outside the in the ongoing Midterm Permit Review. <br />ermi[ area <br />CC. Agreement CDMG <br />of observed regulation <br />hydrologic 2.05.6(2) <br />impacts with <br />" and Although, observed impacts aze consistent with those projected in <br />probable <br />hydrologic requireme <br />ntto keep <br />yes the PHC, the PHC may need updating. A PHC update will be <br />o <br />c i <br />fo <br />ti addressed in the ongoing Midterm Permit Review. <br />nsequen <br />es <br />c nna <br />o <br />n <br />" (PHC) n current, <br />projected in CDMG <br />mining regulation <br />ermit 2.03.3(1) <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.