Laserfiche WebLink
Review Checklist for Annual Hydrology and <br />Reclamation Reports <br />Mine: Eagle 5 & 9 Mines <br />Permit No.: C-81-044 <br />Report Years: AHR -1998 and 1999, ARR 1999 <br />Submitted by: RAG Empire <br />Date received <br />by Division: 1999 AHR - 3/29/U0, report not received for 1998 <br />Date review completed: U31/Ol <br />DMG reviewer: Tom Kaldenbach <br /> Require- <br /> Require- ment <br />Requirement ment complied Comment <br /> citation with ? (yes <br /> nol <br />A. Filing CDMG <br />frequency of regulation yes <br />reclamation x.04.13 <br />re ort <br />B. Timely filing CDMG <br />of <br />reclamation regulation yes <br /> 2,04.13 <br />re art <br />C. General CDMG <br />content of regulation yes <br />reclamation 2,04.13 <br />re ort <br />D. Filing CDMG DMG did not receive a copy of the 1998 hydrology report. The <br />frequency of regulation no 1998 report was on file at the mine site, as indicated in DMG <br />hydrology 4.05.13(4) inspection reports. A 1999 report was filed. <br />re ort (c) <br />E. Timely filing CDMG <br />of hydrology regulation no See item D, above. <br /> 4.05.13(4) <br />report (~) <br />F. Filing <br />frequency of NPDES <br />NPDES permit <br />Discharge CO- yes <br />Monitoring 0034142 <br />Re orts <br />G. Timely filing NPDES <br />of Discharge permit <br />Monitoring CO- yes <br />Re orts 0034142 <br />H. Sampling NPDES <br />frequency of permit <br />NPDES CO- Yes <br />outfalls 0034142 <br />Page 1 <br />