Laserfiche WebLink
MarrMine and Loadout <br />2006 Reclamation Repoli <br />12.0 REVEGETATION SUCCESS EVALUATION <br />March 23, 2007 <br />Revegetation success sampling was completed in 1999 on the pre-1986, 1995, and 1996 <br />reseeded areas. The results of this sampling are contained in a report prepared by ESCO <br />Associates Inc. dated February 2000. This evaluation incuded cover, annual production, shrub <br />density and species diversity/composition. Based on the sampling results, revegetation in these <br />areas satisfies the applicable revegetation success standards except for cover or shrub density <br />in the pre-1986 reclamation area. Kerr has continued managed grazing operations on <br />reclaimed areas and anticipates that the combination of grazing, progressive vegetative <br />establishment from the initial revegetated community, and natural re-invasion will enhance <br />cover and shrub density. Kerr completed year 9 revegetation success monitoring in 2005 and <br />year 10 in 2006. <br />13.0 BOND RELEASE <br />Phase 1 bond release for the 720 Pit was approved in 1995 (173 acres) and for the Pit 1 in 1996 <br />(48 acres). These areas were initially submitted in the same bond release application but were <br />separated into different requests. An application for Phase I release for the Loadout Area and <br />Phase II release for the 720 Pit and Pit 1 Areas was filed with the DRMS in SL-02. Following <br />the bond release inspection, DRMS approved the application for partial bond release on June <br />26, 2001. These areas included 6.9 acres for the Loadout (Phase I) and 169 acres for the 720 <br />pit and Pit 1 (Phase II). Apparently 3.6 acres within Pit 1 were excluded from the release due to <br />poorer vegetation status. An application for Phase 1 bond release was filed with the DRMS in <br />May 2001 for the Mam Pit Area (pre-1986 reclamation). DRMS approved the Phase I release in <br />June 2002 for 96.5 acres, although the Marr Pit is not included in the bond estimates so no <br />funds were actually released. According to the documents reviewed, 324 acres have been <br />released from Phase I and 169 acres for Phase II as stated in the Division's Findings (06-20- <br />01). <br />14.0 TOTAL DISTURBANCE SUMMARY <br />The following table summarizes the total disturbance at the Marr Mine and Loadout including <br />the reclaimed areas, areas to be recaimed and the permanent facilities. <br />SUMMARY OF DISTURBANCE <br />Mine Area <br />Reclaimed 10 ears or less 241.4 ac <br />Reclaimed greater than 10 ears 108.2 ac <br />Areas to be Reclaimed 0.0 ac <br />Areas A roved as Permanent 36.1 ac <br />Areas Pending Permanent 4.0 ac <br />MINE TOTAL 389.7 acres <br />Loadout Area <br />Reclaimed 10 ears or less 6.9 ac <br />Areas to be Reclaimed (pond 0.2 ac <br />Areas A proved as Permanent 4.6 ac <br />LOADOUT TOTAL 11.7 acres <br />sa~~noocrmo~ano~ai~~~~ NWCC INC. Pages <br />