My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP13423
DRMS
>
Back File Migration
>
Report
>
REP13423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:43 PM
Creation date
11/27/2007 1:12:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981071
IBM Index Class Name
Report
Doc Date
3/18/1996
Doc Name
1995 AHR LIST OF TABLES TO TABLES 39
Annual Report Year
1995
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />\I <br /> <br />TABLE ~ (Continued) <br />HYDROLOGIC MONITORING SrIFS <br />SPOIL WFLLS Alm SPOIL SPRINGS <br />SITE MONITORING FkEQIkNCY <br />Water Level Water Quality <br />or Flow & Field Sanpiirg <br />CCM~ffMS <br /> Parameters <br />Foidel Creek <br />USGS 09243800 hbnthly Quarterly (1) & (2) <br />14 Monthly Quarterly (3) <br />8 hbnthly Quarterly (1) & (2) <br />l1SGS 09243900 Monthly Quarterly (2) <br />Middle Creek <br />UGSG 09243700 hbnthly Quarterly (2) <br />Fish Creek <br />16 Monthly Quarterly (1) & (2) <br />302 Monthly Monthly Oaring irrigation <br /> season only; (1), (4) <br />1002 Monthly Quarterly (1) & (2) <br />Trout Creek <br />- 3~~ Monthly Nunthty During irrigation <br />season only; (1) <br />69 Monthly Monthly During irrigation <br />season only; (1) <br />Notes: <br />(1) Included with Twentyrrrile Coal Crnpany's hydrologic monitoring program. If site is <br />r~enoved frvn TCC's pr[~gram and continued nmit~ring is required, CYCC will rnonitor <br />site. <br />(2) Sanplirg will be performed on a flexible schedule throughout norrrel flay period, March <br />through Septerber. W; thin this time frame, flow and field parameters will be measured <br />twelve (12) tines and four (4) full suite analyses will be conducted. <br />(3) Monthly field sanples when flawing; 4 monthly lab samples obtained once rtmoff begins. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Nbnitoring to begin once <br />Fish Creek Dewatering Facility is functioning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.