Laserfiche WebLink
TABLE 1 (Continued) <br />HYDROLOGIC MJNITORING SITES <br />• WATER LEVEL MEASURE7ENIS <br />SITE MJNITORING FREQUENCY CChNETiTS <br />Water Level Only <br />Foidel Creek <br />14 Nbnthly (1), (2) 8 (3) <br />8 Nbnthly (1), (2) 8 (3) <br />304 hbnthly (1) 8 (2) <br />Fish Creek <br />16 Nbnthly (1), (2) 8 (3) <br />302 Monthly (During Irrigation) (1)(4) <br />• 30~ hbnthly (i) 8 (2) <br />1002 Monthly (1) (2) 8 (3) <br />Notes: <br />(1) Included with Twentyrmle Coal Carpany's hydrologic monitoring program. If site is <br />reroved from TCC's program and continued rtnnitoring is required, CYCC will monitor <br />site. <br />(2) Nbnthly rteasuremnts for rater level collected during ice free months: late Narch <br />or early April through September. <br />(3) These sites are also carponents of surface stream flow monitoring program. <br />(4) First headgate of irrigation ditch downstream of mine discharge. Monitoring to <br />• begin once Fish Creek Dewatering Facility is functioning. <br />