Laserfiche WebLink
Table 1.2-1 <br />Hydrology Monitoring Requirements -New Elk Mine <br />Water Level Field Short NPDES <br />Site or Flow Measurement` List' List <br />PRS-1 <br />PRS-4 (aka NE 080) <br />TH-201 <br />TH-202 <br />TH-203 <br />Q Q A <br />Q Q A <br />M <br />M <br />M <br />PAW-1 Q Q A <br />PAW-2 Q Q A <br />PAW-8 Q Q A <br />PAW-9 Q Q A <br />NEW-2 Q(M) S(M) A <br />NEW-3 Gl(M) <br />NEW-4 Q(M) S(M) A <br />RDA (Pond) ++ ++ A <br />• NPDES Stations: <br />NE-004(Pond) ++ ++ <br />NE-005 (Pond} ++ ++ <br />NE-007 (Pond) ++ ++ <br />NE-008 {Pond) ++ ++ <br />NE-033 (Sewage Treatment) ++ ++ <br />NE-080 (PRS-4) ++ ++ <br />Thickener Pump <br />Recycling Pump <br />C <br />C <br />KEY: M(M) =Monthly, (NE series monitored monthly at commencement of pumping slurry <br />water from preparation plant to the underground mine void.) <br />C =Continuously <br />W =Weekly <br />Q =Quarterly (February, May, August, November) <br />A =Annually (November for all sites except intermittent and ephemeral strems for <br />which storm events will be collected). <br />S =Semi-Annually (May, November) <br />`See Table 28 for parameters included in each suite. <br />=++See NPDES permit for frequency and parameters. <br />• <br />5 <br />