Laserfiche WebLink
BTU EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE LD. NO. 1211-CO-09-01370-01 (SURFACE WASTE PILE) ~~~;~OVED <br />PILE LD. NO. 1211-CO-09-01370-02 (OLD NO. 9 EXCAVATION) p,PR ~-~ 200 <br />DATE/TIME: ZJIoS <br />INSPECTOR SIGNATURE: ~ILLC//I 1~1'l~i~ <br />INSPECTOR TITLE: ~UI~~-~ y~Cadlt~tr, <br />Under the supervision of Michael W. Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />~! A. Stability of fill (quarterly inspection) <br />' B. Critical construction periods: <br />I. Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />filed:\EN\ENVIRONMENTAL\EMPIRE\INSPREP\WASTEPILEFORM.DOC <br />