My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP13326
DRMS
>
Back File Migration
>
Report
>
REP13326
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:40 PM
Creation date
11/27/2007 1:10:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Report
Doc Date
11/15/2005
Doc Name
2004 ARR Response Letter
From
Seneca Coal Company
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2004 <br />CEIVED <br /> <br />C~ <br />Seneca 11-W Mine C-82-057 Seneca Coal Comt~Rlfli~ J 5 ZD05 <br />Mine Name Permit # Permittee <br />Address: 36600 Routt Countv Road #27, P.O. Box 670, Havden, CO 81639 Bivision.f Minerals and Gealosy <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date (March 31), as <br />agreed upon by the Division. It should incude teat, discussion, and maps, of a minimum, in addifion to any <br />other reclamation monitoring data as required by the approved permit. The location of the acreage <br />reported under each land status category and year of seeding (if applicable) should be clearly and <br />accurately identified on a map included with the report. <br />Land Status Category Cumutat ee Total The Calendar Year Cumulative Total' <br />Acres disturbed 1331.6 30.0 1361.6 <br />Acres backfilled and graded 683.0 26.3 709.3 <br />Acres topsoiled 441.8 254.1 695.9 <br />Seeding typically begins the minimum 10-year liability period. Please report the acres for each category <br />below. Do not include acres that have achieved final, Phase III release. <br /> Last Years This Calendar Cumulative 10 Years or Greater than <br /> Cumulative Year Total' Less 10 Years <br /> Total <br />Acres Seeded' 409.4 246.1 655.5 633.2 22.3 <br />'Include if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 1361,6 and the total number of acres: <br />Phase 1 released 0.0 Phase II released 0.0 Phase III released 0.0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed NA <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities2 203.2 <br />Acreage in active mining areas' 449.1 <br />'(excude acres where Phase III release has been achieved) <br />Zlncudes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion <br />and collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and <br />construction areas; office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; <br />coal conveyors; refuse piles and coal mine waste impoundments; head-of-hollow fills; valley fills; ventilation shafts and <br />entryways; and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />3lncludes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />
The URL can be used to link to this page
Your browser does not support the video tag.