Laserfiche WebLink
<br />Henderson Mine, Permit #M-77-342 <br />Site Specific Reclamation Costs <br />Page 6 <br />18. Tailing building/road (45 acres) <br />a) Grading and site preparation. $ 8 <br />b) Revegetate (6 acres at $1,900/acre). $ 11 <br />c) Buffer, 39 acres $ 0 <br />Total... $ 19 <br />19. Mill water return line/Power line (31 acres) <br />a) Grading and site preparation. $ 5 <br />b) Revegetate (8 acres at $1,900/acre). $ 15 <br />c) Fertilize slopes (16 acres at $180/acre, 1 application) $ 3 <br />d) Buffer, 7 acres $ 0 <br />Total... $ 23 <br />20. Seep water canal/Pump house (52 acres) <br />a) Dismantle. $ 0 <br />b) Grading and site preparation. $ 8 <br />c) Revegetate (8 acres at $1,900/acre). $ 15 <br />d) Fertilize slopes (41 acres at $180/acre, 1 application) $ 7 <br />e) Buffer, 3 acres $ 0 <br />Total... $ 30 <br />21. Topsoil stockpiles/roads (190 acres) <br />a) Revegetate (44 acres at $1,900/acre). $ 84 <br />b) Buffer, 146 acres $ 0 <br />Total... $ 84 <br />22. Spotted doe area (24 acres) <br />a) Buffer, 24 acres $ 0 <br />Total... $ 0 <br />