Laserfiche WebLink
Basin Resources, Inc. <br />Quarterly Inspection Report <br />Coal Waste Banks <br />Rules 4.09((1) and 4.10 (2)(2) <br />General Description or Reference to Site Plao: <br />^ Golden Eagle -Exhibit 17, pages 2.OS-19, 2.OS-25(a) through (c) <br />New Elk -Exhibit 30, pages 2.05-27 through 2.05.44 <br />Activity During Inspection: ~D[~ <br />^ Removal of Topsoil or Organic Matter <br />^ lnstalla[ion of Surface Drainage Systems <br />^ Placement of Underdrain(s)* <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction andlor dischazge, <br />inteQQgrity of 100-year 24>-hour appurtenant d/rainage st/ructures, evidence o~fCpositive drainage. <br />~77 / eri/172~ Oc P//9-//7~ {~Lt//S /7/~2~CI7 0~~/vl /C~//1PG~ r~ <br />L.. / e u` t /Yl e ~ Gf G~ ~~ "I - GI ro. ~ ~ i+r,/ e. L//fs `~"` ~Ait/.rte/~/i!/E(~ <br />2 v-~lSfd>'t C i7 <br /> <br /> <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, slopes of sides <br />and faces, construction methodology. ,~ <br />/ % GiC.~ <br />Page I of 2 <br />Was[eBankNo: /'//~nT rry~_ r Kure ~ ioca-c~-~v-oo~`-~i <br />