Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />BATTLE MOUNTAIN GOLD COMPANY <br />~~ ~E!\/CG <br /> <br />~ March 29, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />APR 1 1993 <br />13i~nswn :;~ 1 i;ne~~~s ~ aeo~oyy ~'~~ <br />pJ <br />BAfiLE MOUNWN <br />GOLD COMPlWY <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112 <br />Monthly Pond Compliance Report - February 1993 <br />Dear Mr. Oehler: <br />1 <br />i <br />~-z. q3. <br />..~~.,<i <br />Attached is the February 1993 monthly summary of cyanide <br />analysis performed on samples from the active (upper) pond, <br />the inactive (lower) pond, and the collection pond as required <br />by the approved TR-010. <br />As outlined in TR-010, daily samples of the active pond and <br />the collection pond are analyzed on-site. A weekly sample of <br />the inactive pond is also analyzed on-site. TR-010 specifies <br />a simple monthly average for regulating pond compliance. The <br />February averages are as follows: <br />Active Pond 1.38 ppm CN-wad, 3.03 ppm CN-total <br />Inactive Fond i.30 ppm Civ-wad, 1.7o ppm CN-total <br />Collection Pond 1.34 ppm CN-wad, 2.19 ppm CN-total <br />The February simple averages show compliance with our permit <br />standards of 3.8 ppm CN-wad and 4.4 ppm CN-total. <br />Samples collected on February 3 and 18 were analyzed by Core <br />Laboratories for outside lab verification. The preliminary <br />analysis reports from Core Labs are attached; final reports <br />from Core Labs have not been issued. <br />If you have any questions, please call. <br />Sincerely, <br />~W. '14 ~ d <br />Alana L. Scott <br />Environmental Engineer <br />Enclosures <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />P.O. BOX 310 SAN LUIS, COLORADO 81152-0310 (719) 672-3362 FAX (719) 672-3363 <br />