My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP13174
DRMS
>
Back File Migration
>
Report
>
REP13174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:35 PM
Creation date
11/27/2007 1:08:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
5/26/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC SAN LUIS DMG PN M-88-112 BI WEEKLY WATER SAMPLING REPORT MAR 4-5-1993
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiiiiiiiiiiu ~~~ <br />BATTLE MOUNTAIN RESOURCES, INC. <br />May 24, 1993 MAY 26 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geolo[~/•~ <br />~1/IVISlJu .,: Ivllildi u,;, ,,~ .]UJJy~~ . <br />1313 Sherman Street, Room 215 gy nerAOUNwri ~. <br />Denver, Colorado 80203 GOLDCofvANV Y ,(5 <br />~~ <br />(/ <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luis <br />DMG Permit No. M-88-112 <br />Bi-Weekly Water Sample Report - March 4-5, 1993 <br />Dear Mr. Oehler: <br />Enclosed are the analytical reports from Core Laboratories <br />for the bi-weekly water samples collected on March 4-5, 1993 <br />as specified in the April 1992 Abatement Plan. The final <br />analytical reports from Core laboratories were received at <br />the San Luis Mine on May 17, 1993. <br />This sampling event coincided with the second site visit of~ <br />the independent third party sampler, Dr. Ann Maest of <br />VVRCG/Hagler, Bailly, Inc. As part of the third party <br />sampling, filtered and unfiltered samples for the analysis <br />of cyanide (total and wad), metals, and nitrate/nitrite were <br />collected from the three ponds. The additional analytical <br />reports are included with the routine bi-weekly reports. <br />The cross-reference table between sample identification <br />numbers and sample locations is attached. As specified in <br />TR-006, calculated free and wad cyanide values for the <br />process point samples are enclosed. The calculations are <br />based on dissolved metals results. <br />No deviations from the sampling QA/QC protocols, TR-006, <br />were noted for any of the samples collected. However, it <br />should be noted that approximately eight inches of ice was <br />chipped from the surface of the RS-5 sampling location <br />before flowing water was reached. The sediments in the <br />stream bed were disturbed during ice removal. The stream <br />bed was given time (approximately 2 hours) to settle, <br />--- - <br />! ~ and the flowing water was allowed to visibly clear. ~Fpur <br />w{uAj)~~<~'~process points and RS-5 were sampled. A barrel filter rinse <br />,,,*: blank and a field blank were taken as field quality control <br />p~ °"f ~ ~fG+F samples. <br />/r <br />r <br />The groundwater sampling pump was not operating properly. <br />The internal housing for the motor shaft was cracked causing <br />the shaft rotation to be restricted and the pump motor to <br />overheat. Therefore, the groundwater wells were not <br />sampled during this bi-weekly. The pump was sent to a <br />representative of the manufacturer for repair and was <br />A?'Ufl.S/DIARY OF RA7TLF AfOUMAIN UOLD COMPANY <br />P.O. BOX 31U S.4N LUIS. COLORADO 8 1 1 52-07 10 (7I9) 672-336? FAX 1719) 67L 3363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.