Laserfiche WebLink
Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />Permit No.: M-1999-120 Permittee: L. G. Everist. Inc. <br />Operations Name: Fort Lupton Sand and Gravel Mine <br />Anniversary Date: June 1.2005 <br />Total Fee Due: $688.00 <br />1. a. Permitted acreage: 85 + 212 = 297 b. County where mine is: Weld <br />2. Has this mine been granted Temporary Cessation Status? ~ YES <br />Does this mine operate MORE or LESS than 180 days per year? <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year: <br />a. Total acres affected to date <br />5. Total acres reclaimed for the report year: <br />6. Total number of acres in topsoil replacement stage: <br />a. Average fhickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: not applicable -this is a phased operation <br />9. The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used for the report year: <br />10. Estimated total acres to be affected iri the next report year: <br />MOR LESS <br />ES NO <br />approx. 15 acres <br />approx. 56 acres <br />2-3 acres sloped <br />not applicable <br />not applicable <br />10-12 acres <br />seed mix as per permit <br />not applicable <br />none used <br />i 3-1 B acres <br />11. Comments: The 112 Reclamation Permit. M-1999-120. was amended this vear. approval was <br />granted February 10. 2005. The amendment added 212 acres to the permit. We have attached both <br />a vicinity map and an extraction plan map which show the amendment areas this year's mining <br />seeding and reclamation and also next year's projected mining area. A brief description of this past <br />year's activities follows: The actual mining operations this vear were of course all within the originally <br />permitted area. We mined father east to complete the southeast section, and then mined much of the <br />northeast section of the orioinal area. The southeast corner of the site has been partially reclaimed <br />with 3:1 slopes Temporary berms and topsoil stockpiles have been seeded with a temporary seed <br />mix. The berms are located along the eastern and southeastern borders and the stockpile is located <br />in the northwest corner of the original permit area. The ground surtace above the slurry wall has <br />been permanently seeded along the western and southwestern borders. Next vear, we plan to mine <br />the north-middle section of the original area Please see the attached maps for reference. <br />Please Show the location of the acreage for items 4-6 on your map". Intlicate the phases of the reclamation which have been <br />completed, correlated with your timetable. For phased operations, show dates eMraction ceased & dates reclamation began. <br />NOTE: ff there have not been any changes since the last annual report and you previously submitted a map which correctly <br />depicts the current a ea a ~n items/~2lhrough 6, then a map is unnecessary. However, this must be stated abov~ej. <br />iature: .i~~•f//t!/i Date: ~Zv <br />Please type or print current <br />Contact Name & Title: _ <br />Company and Address: _ <br />Telephone and Fax: <br />Federal TaxlD: <br />name, mailing address, and phone number below: <br />LNUFL-DMGann rpf-052605. doc <br />