Laserfiche WebLink
• ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-325-I 16(3)(x), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances w affzcted land. <br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipatzd to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Pleasz attach such <br />a report and map to enclosed annual repon form. (An adequately labelzd map tha[ clearly delineatzs and includes <br />the above elements may suffice for a written report.) <br />if your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report thz following information as required by 2 CCR 407-1.407-4, and Rules <br />1.13.7(1)(a): <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />s[andards and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicab]e: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1 ~(I)(a), provide an updated <br />staterrfent regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. y <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1~(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independen[ appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />and the value of the property subject to either of these instruments. The report shall also provide <br />~_ __proof-that there_are-no past-due property taxes. - ~ - - ~- _ - - -- -- _ <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed ten percent (1090) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4,9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, [he operator shall providz a report in sufficient <br />detail to Fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as pan of the approved permit application, [a include the Environmental Protection Plan. (Pleasz <br />no[e that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />