My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP12966
DRMS
>
Back File Migration
>
Report
>
REP12966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:27 PM
Creation date
11/27/2007 1:04:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
12/13/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC BMRI SAN LUIS PN M-88-112 TAILINGS AREA CONST ACTIVITIES WK NOV29 1993
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ III IIIIIIIIIIIII III <br />BATTLE MOUNTAIN RESOURCES, INC. <br />November 30, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, <br />DMG Permit No. M-88-112 <br />Tailings Area Construction <br />Week of November 29, 1993 <br />Dear Mr. Oehler: <br /> <br />.. ~ r 1°g? <br />Jl~'> ~3 .`l ~ <br />~: <br />&JiLE MOUNWN <br />D COM7ANV <br />Inc. (BMRI) - San Luis <br />Activities <br />During the week of November 22, 1993, construction <br />activities were limited to placement of liner cover material <br />along the north and east sides of the facility and <br />stockpiling of liner cover material in the borrow pit. <br />Construction of the main embankment continued. On November <br />18, the Division verbally approved the tie-in of the south <br />abutment of the main embankment. Doug Gibbs of Water, <br />Waste, and Land (WWL) has been on-site since November 18. <br />On November 22, Allen Sorenson inspected the site; hiss <br />inspection report identified no concerns or problems. <br />Settlement marker information is enclosed. Marker #6 was <br />damaged on November 20. <br />The following is a summary of construction activities for <br />the week of November 29, 1993: <br />-Continue stockpiling and placement of liner cover ma•r_erial <br />on the east side of the facility. Approximately 7 acres of <br />liner remains to receive drainage blanket material. We <br />expect to complete placement of the drainage blanket by <br />early December, pending weather conditions. <br />-Continue construction activities for the main embankment. <br />BMRI has not received inspection reports from the Division's <br />site visits on October 7 and October 28. BMRI requests that <br />these reports be immediately issued so that any concerns <br />noted by the Division can be quickly resolved. Once again, <br />as a means of maintaining effective and efficient linfes of <br />communication, we request that inspection reports be <br />completed and issued while the Division is on-site. <br />If you have any questions, please call. <br />Sincerely, <br />~~,qa S~- <br />Alana L. Scott <br />Environmental Engineer <br />A SU0.5/DIAR I' OF OATTLL dfD UNTAIN GOLD COMPANY <br />P.O. BOX?IU SAN LUIS, COLORADO %1152-0310 (719)67?-JJ6~ FAX p19)672-7363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.