Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />BATTLE MOUNTAIN GOLD COMPANY <br />January 30, 1997 /~ <br />f ~~ 0 31991 BATTLE MOUNTAIN <br />Mr. Jim Dillie GOLD COMPANY <br />Division of Minerals and Geology <br />...,.:o~~9Y <br />1313 Sherman Street, Room 215 ~-'~ "- ° ' " "' "' "~ <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luie Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />January 19, 1~9i9/7p\~\- January 25, 1997 <br />Dear Mr. Dillie: lA /i 7-- <br />Attached ie a s (ummary of the on-site cyanide analyses performed on samples from <br />the tailings pond and the collection pond during the week of January 19 - January <br />25, 1997 as required by the approved TR-010. <br />During the week, the tailings pond was 0.51 ppm CN-wad and 0.48 ppm CN-total. <br />The collection pond was 0.16 ppm CN-wad and 0.41 ppm CN-total. <br />Sincerely, <br />~~ <br />Richard Neu <br />Metallurgical Engineer <br />cc: Anne Baldrige <br />Dan Robertson <br />.- c <br />P.O. BOX 310 SAN LUIS. COLORADO 81152 <br />(719) 672-3362 FAX (719) 672-3367 <br />