Laserfiche WebLink
EXHIBIT E RECFIVED <br /> MINING PLAN MAP MAY 0 2 1001 <br /> Division Of Minerals and Geology <br /> Topsoil will be stripped and stockpiled in the southeast corner of the pit. <br /> Overburden will be separately stockpiled. Stockpile slopes will be no <br /> greater than 3H:1V. Topsoil is approximately 5" deep and overburden may <br /> be 25" deep. General direction of mining will be north from the southeast <br /> corner. Depth will be 10-20'. <br />