Laserfiche WebLink
L J <br /> <br />Table 1-1 <br />Hydrology Monitoring Requirements - Lorencito Canyon Mine <br /> Water Level Field Analytical <br />Site or Flow Measurement' List <br />Surface Water <br />JC-1 Q" SS A <br />LC-1 Q° S5 A <br />LC-2 Q° SS A <br />PC-1 Q° S5 A <br />PRGTY-1 Q° SS A <br />PRGTY-2 Q° SS A <br />Springs <br />PJC-1 S S <br />Ponds <br />PJC-1 A' <br />Alluvial Wells <br />MWJC-1 Q° S5 A <br />MWLC-1 Q° SS A <br />MWLC-2 Q° SS A <br />MWPC-1 Q° SS A <br />MWLO-W (Destroyed 4/2005) Q" S5 A <br />MWLO-E Q` S5 A <br />KEY: Q =Quarterly (February, May, <br />August, November) <br />S =Semi-Annually (May, November) <br />A =Annually (November) <br />'See Table 1-2 for parameters included <br />in each suite. <br />ZSpring samples to be collected in August <br />3Pond Water Level to be collected in May <br />°Semi-annually prior to commencement of <br />mining <br />SAnnually prior to commencement of mining <br />2 <br />