Laserfiche WebLink
<br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-33-I I b(3t, and CR.S. i-i-3_'.~-I I b(~l(al, on the anniversary date of the permit each year, <br />the operator shall submit a rrpor[ and a map showing the extent of current disturbances to affected land. <br />reclamation accomplished to date and dunng the preceding year. new disturbances that are anticipated to occur <br />during the upcoming year, anil rulamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adzyuatzly labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />`'If your operation is subject to the provisions of Temporary Cessation as' defined in the Act and Rules. you must <br />provide +aith the Annual Report the Following information as required by ?CCR 407-I, 407-4. and Rules <br />1.13.7(Ij(a): <br />(I) the condition of the operation at the time of cessation: <br />(i) what specific measures have been and will be implemented to comply with recla~na[ion, <br />perfonn:mcz standards- and Em~ironmenrtl Protection Plan requirements, if they are pan of your <br />approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional follo++ing information with your Annual Report, as applicable: <br />(a) Per the requirements of 3 CCR 407-1, 407--1, and Rules 1.1 ~(1), provide an updated statement <br />regarding the sufficiency of the value of the Fin;mcial Warranty, specifically: <br />(U Pzr the requirements of 2 CCR 407-I, 407-4, and Rules 1.1 ~(1)(a), provide an updated <br />statement re~ardin~ the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security aereements, self-insurance, sah-a~z <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicatin, any changes in property value, and a statement summarizing <br />any circumstances ++hich may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of the property subject to either of these instruments. <br />The report shall also provide proof that there are no past-due property ta.ees. <br />(iii) Per the requirements of 2 CCR 407- 1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, [he operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent (10`7c) of the banks capital surplus accounts. <br />(vi) Per the reyuirzments of ?CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully dzscnbe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(h) Per the regmrements of '_ CCR -107-1, 407-4, and Rules 1.1 i(I)(z), all monitorine information <br />required as part of the approved permit application, to include the Environmental Protection Plan. <br />(Please note that if you are not a Desi~mated Mining Operation, you will not have an Environmental <br />Protection Plan as part of your approved pem+it.j <br />