My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP12601
DRMS
>
Back File Migration
>
Report
>
REP12601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:15 PM
Creation date
11/27/2007 12:56:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Report
Doc Date
4/3/1995
Doc Name
SOMERSET MINING CO QUARTERLY GOB PILE INSPECTIOON REPORT PN C-81-022
From
SOMERSET MINING CO
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br />First Quarter 1995 <br />ENGINEERING INSPECTION <br />SOMERSET MINING COMPANY <br />EAST YARD GOB DISPOSAL PILE <br />On March 27, 1995, I performed a visual inspection of the east yard <br />gob disposal area at Somerset Mining Company's, Somerset Mine. <br />Both Bear Coal Company and Somerset Mining Company have approval to <br />dispose of coal mine waste in the gob pile. <br />Page 2.05-19ii, dated 12-10-92, of Somerset Mining Company's <br />approved permit document includes the requirement to inspect the <br />coal mine waste pile for stability quarterly. The inspection is to <br />be performed by a registered engineer or other qualified <br />professional specialist experienced in construction of earth and <br />rockfill embankments. The quarterly inspection report is to note <br />the volume of waste material placed in the pile since the last <br />inspection. <br />The gob disposal area was dry. Nothing was observed during the <br />inspection that would indicate the pile has a potential for <br />failure. Compaction tests were performed for fourth quarter 1993, <br />second quarter 1994, and fourth quarter 1994. Gob material has <br />consistently passed compaction tests. Compaction tests will be <br />scheduled during the second quarter 1995. <br />Somerset hauled approximately 942 cubic yards of material to the <br />gob pile during the quarter. Bear Coal Company did not haul any <br />material to the gob pile during the quarter. <br />A failure of the pile would probably not be a hazard to human life. <br />The pile is located above a large flat bench referred to as the <br />east yard. The bench is 80' to 100' wide directly below the pile. <br />If the coal mine waste pile failed, it would very likely be <br />contained in the east yard. The overland conveyor and conveyor <br />drive on the bench below the pile might be damaged by a failure of <br />the pile. <br />_,:-R°~ <br />' •;' :: <br />C. Anderson Date <br />coo %Iieg,istered <br />sional;$ngineer No. 14726 <br />_; ~ ~:' . <br />..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.