Laserfiche WebLink
-- <br />r Permittee: WHITEWATER BUILDING MATERIALS CORP. PAGE 3 <br />Permit #: M-77-129 <br />Operation Name: WHITEWATER 500 PIT <br />Anniversary Date: 09122/98 <br />around the Stage 1 lake next fall. Bank sloping and grading <br />will continue once mining is completed on the shore line <br />that will not be disturbed in the future in Stage 2. The <br />material to complete the sloping is in place, so only the <br />physical activity to complete it is needed. <br />(5) The current contact for this pit is: <br />Mr. Edward Gardner (970) 242-7538 <br />whitewater Building <br />Materials Corp. Fed Tax ID # <br />940 South 10th Street <br />Grand ,junction, Co 81502 <br />The annual report date is September 22, 1998 and the effec- <br />tive date of all information is August 20, 1998. Enclosed is the <br />Annual Report Map and a check for $550.00 to cover the Annual <br />Fee. Please date stamp the copy of this letter to indicate your <br />receipt of this Annual Report, Annual Report Map and the Annual <br />Fee and return it to Environment, Inc., 7985 Vance Dr., Suite <br />205A., Arvada, CO 80003. <br />Respectfully Submitted <br />WHITEWATER BUILDING MATERIALS CORP. <br />~~~ <br />Edward M. Gardner <br />Vice President <br />cc file <br />Environment, Inc. <br />D1\WP61D0C5\ANNUALS\WHIT EWAT \S~U.98 <br />