My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP12315
DRMS
>
Back File Migration
>
Report
>
REP12315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:07 PM
Creation date
11/27/2007 12:52:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981011
IBM Index Class Name
Report
Doc Date
6/30/1997
Doc Name
1996 ANNAUL HYDROLOGY REPORT FOR APEX 2 MINE PN C-81-011 SUNLAND MINING CORP SUMMER AND FALL WATER
From
DMG
To
GREG LEWICKI AND ASSOCIATES
Annual Report Year
1996
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Mr. Greg Lewicki <br />Greg Lewicki and Associates <br />June 24,1997 <br />Selection of the proposed well's location should take into account Trout <br />Creek's influence on any alluvial ground water contamination that may <br />come from the site and the possible flow path of any such contamination. <br />The proposed new alluvial monitoring well can be expected to adequately <br />detect ground water contamination from the Apex site thus eliminating the <br />need for drilling any deeper than the alluvium. <br />6. Proposed reactivation of reclaimed upstream alluvial monitoring well. <br />Since 1995 when an upstream alluvial monitoring well was backfilled, <br />water in the alluvium upstream from the Apex site has been sampled by <br />taking samples directly out of Trout Creek. Now Apex has agreed to <br />reopen this old alluvial well for monitoring as noted in Item 5 in the <br />Division's questions and comments letter for the 1995 annual hydrology <br />report (letter dated February 20, 1997). The well has not yet been reopened. <br />Page 4 <br />Taking upstream water samples from this alluvial well, rather than from <br />Trout Creek itself ,will allow more valid comparisons to be made between <br />data from up-gradient and down-gradient alluvial water samples. The <br />Division requests that a written clarification of the plans for reactivating ~ p ,9 <br />this well be included in the revisior: mentioned in /tem 4 above. Also, the 1` <br />Division requests that you note in the update requested in Item 3, above, the <br />approximate date in 1995 when the upstream well was bac~lled. <br />Reminder on pond reports. Please provide a P.E. stamp on the pond ~c19 ~ l°r°"~ <br />reports and submit them to the Division on a quarterly basis according to ~ off- g~' <br />the schedule on page 65.06 of the Apex permit application. <br />Please let me know if you have any questions. <br />Sincerely, <br />T.>~ r~.~d,~,.~~.2 <br />Tom Kaldenbach <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.