Laserfiche WebLink
NATIONAL KING COAL, INC. <br />-III IIIIIIIIIIIIIIII <br />999 <br />p0~ <br />1315 Mein Aven ue, M314 MINE OFFICE: <br />Post O1}Ica Box 2805 4424 County Roetl 120 <br />Durango, Coloretlo 81302 Hesperus, Coloratlo 61326 <br />Telephone: <br />(303) 259-2416 <br />Fex: <br />(303) 259.4618 <br />Telephone: <br />(303) 365-4526 <br />Fax: <br />(303) 3654636 <br />RECEIVED <br />July 13, 1998 <br />JUL 1 ~ 1g96 <br />Division of Minerals 8 Geology <br />State of Colorado <br />Division of Minerals <br />11313 Sherman Street <br />Room 215 <br />and Geology <br />Denver, Colorado 80203-2273 <br />Attention: Harry Ranney, Reclamation Specialist <br />Re: Second Quarter 1998 Surface Subsidence Inspection <br />Second Quarter 1998 Huntington Ditch Inspection <br />Dear Harry: <br />There are no new cracks aver Section Na_ 4 Right as of this <br />inspection. <br />Another area where pillars have recently been extracted is <br />beneath the Dunn/Ute Mountain Ute Tribe Lease. OSM has been <br />checking, measuring, photographing and mapping these cracks on a <br />monthly basis. These cracks look much like the cracks which are <br />not under OSM jurisdiction. <br />The other areas where pillars have recently been extracted are <br />Sections No. 6 South and 5 South/1 Left. The 6 South area <br />exhibits normal subsidence tension cracks extending. north from a <br />point about 300 feet north of the Huntington Ditch. This area of <br />the ditch has been replaced with a buried pipeline., Nn cracks <br />appear to be approaching the pipeline. <br />Call if you have <br />Sincerely, <br />Tom Bird <br />any questions. <br />Planning 5 Engineering <br />National King Coal, LLC <br />