<br />Mined Land F.'eclamation t'~larch 1=', 198: F'age
<br />021
<br />Auqust, 198;, IVot. tied in this Survey
<br />7uiy, 1986 4ii;,199.11 1,4'9,4..34.26 6689.50
<br />November, 1986 402,199.03 ].,49,433.98 6687.97
<br />See Table 7 for Mean
<br />022
<br />August, 198,`_" Not tied in this Survey
<br />July, 1986 401,687.99 7.,439,425.44 6997.50
<br />November, 1986 4U1,688.OCti 1,439,425.40 6997.37
<br />MEAN 401,688.00 1,439,425.42 6997.44
<br />See Also Table 7.
<br />Slope Stability Stations at Pear #2 and Pear #~ Are Tied to D-11-
<br />U and D-12-U through a series of primary loops:
<br />Pear #2 U 13
<br />LI 14
<br />U 15
<br />Pear #3 U 16
<br />U 17
<br />U 18
<br />U 19+
<br />Monument = #5 Rebar
<br />Note that U ~u has not been included in this li=_t. The location
<br />of 020 in front of the main portal resulted in repeated destruc-
<br />tion due to the necessity of Bear Coal Company to 4:eep the portal
<br />bench maintained by grading operations. In Table is a list of
<br />Stations with their coordinates and elevations for August, 1985,
<br />June, 1986, November, 1986 and the resulting mean values.
<br />PEAk SITE #2
<br />Northing Easting Elevation
<br />013
<br />August, 1985 404,387.70 1,443,503.79 6119.22
<br />July, 1986 404,390.05 1,443,50.3.17 6117.58
<br />November , 1 986 4Ci4, 3.90. Cab 1 , 443, 503.11 611 7.49
<br />MEAN 404,390.06 1,44~~,503.14 6117.54
<br />•
<br />Note: U 13 Mean does not include August, 1985. Monument appears
<br />to have moved ?. 43 in a NW dir ection form Au gust, 1985-June,
<br />1986.
<br />
|