Laserfiche WebLink
otice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />Permit No.: M-1999-120 <br />Operation Name: Fort Lupton Sand and Gravel Mine <br />Anniversary Date: June 1.2007 <br />Total Fee Due: $688.00 <br />1. a. Permitted acreage: 85 + 212 = 297 b. County where mine is: Weld <br />2. Has this mine been granted Temporary Cessation Status? ~ YES <br /> Does this mine operate MORE or LESS than 180 days per year? MOR LESS <br />3. Does this mine have a phased reclamation plan? ES NO <br />4. Total acres affected during the report year: * approx. 30 acres <br /> a. Total acres affected to date approx. 96 acres <br />5. Total acres reclaimed for the report year: * not app licable <br />6. Total number of acres in topsoil replacement stage: * not app licable <br /> a. Average thickness of topsoil replaced: not app licable <br />7. Total number of acres seeded: * 0 acres <br /> a. List species seeded & seeding rate for report year on back seed mix in permit <br />8. For non-phased operations provide dates extraction ceased: not app licable <br /> a. Date reclamation began: not app licable <br />9. The type and approximate quantity of fertilizers, organic material or <br /> soil conditioners used for the report year: none used <br />10. Estimated total acres to be affected in the next report year: * 15-20 acres <br />11. Comments: <br />We have been mining in two areas in the last vear from June 2006 until present: the Golden phase <br />and the Fort Lupton East phase. The Golden phase is almost completely mined out. We will start <br />reclaiming this area this vear. It already has a slurry wall liner around the perimeter. We will be <br />building up the interior slopes to the permitted 3:1 angle. We will be mining in the Hill-Oakley phase <br />this comingyear and will continue mining in the Fort Lupton East phase. We may start reclaiming the <br />Fort Lupton East phase in 2007. Before we start mining the Hill-Oakley phase, we will be moving the <br />office/scalehouse and mine entrance to one of our other permitted access points. Please see the <br />attached map for reference to the described areas. <br />Please show the location of the acreage for items with a ' on your map. Indicate the phases of the reclamation which have <br />been completed, correlated with your timetable. Phased operations: show dates eMraction ceased & dates reclamation began. <br />NOTE: If there have not been any changes since the last annual report and you previously submitted a map which correctly <br />depicts the current acreage~in it~e~ms 4 through 10, then a map is unnecessary. However, this must~bge stated aboveh. <br />Signature:~~(~/ "' ~ Date: (/~~ V <br />Please supply current contact name, company, mailing address, phone & fax numbers, and Federal ID below: <br />Contact Name & Title: Lynn Mayer Shults Regulatory Manager <br />Company and Address: L G Everist Inc. 7321 East 88 Avenue Suite 200 Henderson. CO 80640 <br />Telephone and Facsimile: telephone - 30 <br /> <br /> <br />