My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP12182
DRMS
>
Back File Migration
>
Report
>
REP12182
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:43:02 PM
Creation date
11/27/2007 12:51:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981202SG
IBM Index Class Name
Report
Doc Date
12/2/1998
Doc Name
SILT PIT ANNUAL REPORT MLRB PN M-81-202 GARFIELD CNTY
From
FLAG RESOURCES INC
To
DMG
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAB SAND AND GRAVED. ~ PABE 2 <br />NOVEMBER 24,1997 <br />This leaves the slopes into the excavation at their final <br />configuration when the lake fills with watery Stage 5 is <br />still used as processing plant site and contains gravel <br />stockpiles, concrete casting beds, and the office facili- <br />ties. <br />(2) No reclamation was required this year. How <br />sloping and recoiling on 2.78 acres ± of la <br />the northwest side of the lake last year (b <br />mation will be required in the undisturbed <br />(dark green). All the slopes from existing <br />the bottom of the mined area have been redo <br />and will be worked that way from now on. V <br />mation is needed in the lake area as we are <br />shaping slopes as we go. We plan to backfi <br />area mined this year with oversized rock le <br />ing and will recoil and revegetate it when <br />(3) Mining will continue in Stage 1 in the north <br />until the topsoil area is done. We are reac <br />where it is not economical to continue to de <br />lake area. This year, once the topsoil pile <br />and reclaimed, we will begin opening a new m <br />the east side of Stage 1 and allow the water <br />to normal levels in the existing mined area. <br />between the two lakes will be in-situ gravel <br />as a barrier between the lake and the mining <br />is removed later in the life of the mine. T <br />previously stripped and used as plant site a <br />areas. Work may begin on the deeper deposit <br />within the Riparian area this year, also. A <br />acres ± may be mind this year. We will cont <br />the constructed wetland area and do remedial <br />necessary. <br />(4) No reclamation is required next year but we ~ <br />do reclamation on the slopes as miring progr~ <br />sloping is completed along the north side of <br />area will be topsoiled also. Once the water <br />in the lake area the above water slopes will <br />This may not be until the fall of 1999 or thi <br />2000. We are also working on a TECHNICAL RED <br />the Stages from this plan and make minor chat <br />from the gravel loss on the south side of thi <br />(5) The current contact for this pit is: <br />Mr. Fred Frei (303) 876-2397 <br />Flag Sand and Gravel, Co. <br />1412 311 Road <br />New Castle, CO 81641 <br />Fed Tax ID # <br />r we completed <br />shore along <br />n). No recla- <br />land area <br />ound level to <br />to 3h to lv <br />little recla- <br />ning and <br />the 3.37 acre <br />from process- <br />e. <br />act corner <br />ing a point <br />ater a large <br />area is mined <br />ning area on <br />level to return <br />The separator <br />that will act <br />area until it <br />is area was <br />d stockpile <br />of gravel <br />other 5.00 <br />nue to monitor <br />work if it is <br />sill continue to <br />asses. As more <br />Stage 1 that <br />.evel stabilizes <br />be reclaimed. <br />spring of <br />VISION to remove <br />iges resulting <br />mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.