Laserfiche WebLink
page 4 <br />approval should stipulate the provision of fill material testing results. <br />The application includes the consultant's recommendation to test spoil <br />materials when the mining begins. These materials testing results should <br />be required within six months after fill placement begins, and. the stability <br />analysis should be repeated and amended if they differ appreciably from the <br />assumptions utilized in preparing the preliminary analysis included in the <br />Empire Energy Corporation's permit application submittal. <br />cc: Dean Massey <br />