Laserfiche WebLink
• <br /> <br />VALCO, INC. <br />PUEBLO CONCRETE DIVISION <br />P. O. BOX 657 <br />PUEBLO, COLORADO 81002 <br />(303) 56 18350 <br />We have just this month finalized the purchase of the D.&R., C.W. <br />Railroad right of way that runs through the middle of our property. <br />With this acquisition, we can put a trench from the lake in Stage I <br />and run the water to our dewater pumps. Then mine this part be- <br />tween Stage I and Stage II. This we will do soon while we still <br />have our field conveyor set up there to transport gravel to the <br />plant. This is the same plan I talked about when you were here in <br />July, except at that time, I had no idea when the railroad would <br />sell it. <br />This would be a part of Stage II and the mining time table <br />would be 1986 and 1987. The balance of Stage III north side of <br />gravel plant will be mined 1986 through 1988. <br />I will send in an application to amend this permit with regard <br />to page 6, Exhibit D of our application. We have now acquired part <br />of the property between Part I of Stage 4 and Part II of Stage 4. <br />At this time, we are negotiating for the balance of this land to <br />make it one continuous piece. If this falls into place, I will <br />soon be able to give you a complete new mining time table. <br />~~~ <br />L?LCQCIL~f~ T"/!;0-CI.Q.Q (ink Q,{,C~t, ~ <br />c ~ 3/2s/s~ <br />ROCKY FORD LAM AR CANON CITY <br />