® ®.
<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />According to CR.S. 34-32-116(3), and C.R.S. 34-33.9-1 1~5(3)(a), nn the anniversary date of the permit each year,
<br />the operator shall submit a report and a map showing the extent of culrem disturbances to affected land,
<br />reclamation accomplished to date and dunng the precedin:; year, new disturbances that are anticipated to occur
<br />during the upcomin=: }'ear, and reclamation that will be performed during the upcoming year. Please attach such
<br />a report and map to inclosed annual report form. (An adequately labeled map that clearly delinc;ates and include:;
<br />tye~above elements may suffice for a written report.)
<br />~~
<br />If vour operation is wbject to the provisions of Temporary Cessation as defined in the Ac[ and Rules, you must
<br />provide-with the Annual Report the following information as required by 2 CCR 407-1, X107-4, and Rules
<br />W
<br />1
<br />(I) the condition of the operation at the time of cessation;
<br />(ii) what specific measures have been and will be implemented to comply with reclamation,
<br />performance standards and Environmental Protection Plan requirements, if they .ue part of your
<br />approved application; and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with }our Annual Report, as apFdicable:
<br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.19(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />([) Per the requirements of 2 CCR 407-I, 407-0, and Rules 1.19(])(x), provide an updated
<br />statement regarding the sufficiency of the value of the financial wan-anty. Specifically,
<br />irrevocable letters of credit, Deeds of Trutt, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />(ii) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.19(1 )t h), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances which may affect [he adequacy of the Deed of Trust, or Security Agreement,
<br />and the value of the property subject to either of these instruments.
<br />The report shall also provide proof that there are no past-due property [axes.
<br />(iii) Per the requirements of 2 CCR 407-I. 407-4, and Rules 4.7(3), permits secured with an
<br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />o(a balance sheet, certified by a Certified Public Accountant, demonstrating that the
<br />Lever of Credit dues not exceed ten percent (I0°In) of the bank's capital surplus accounts.
<br />(vi) Per the reyuirrnnnts of 2 CCR 407-1, 407-4, and Rules 4.9.30), fanners secured by a First
<br />Prionty Lien on any fixwres and Equipment, the operator shall provide. report in wfficient
<br />detail to fully de.cribe the condition, value, and location of all pledl;ed lixmres
<br />^md Cq UlpmCml.
<br />(h) Per the requirements of '_ CCR -3(17-1, 407-4, and Rules 1.15(11(cI, all monitoring information
<br />required as pan of the approved permit application, to include the Environmental Protection Plan.
<br />(Please note than if yuu are not a Desienated Mining Operation, you wall not have an Environmental
<br />Prolcclinn 1'Inn ac pan of v~wr approved permit)
<br />
|