Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 1 Mine <br />2003 Annual Hydrology Report <br />B06 <br />Borehole 6 <br />Depth - 93.8' <br />Elevation - 6780.5' <br />IniBaled 911/1981 91111981 <br />Activated 9/1/1981 91111981 <br />Date 12118/2003 6/3012003 <br />Summary Information <br />Fie - <br />P„arameteis Baseline Operation <br />UNITS Min Ave Max Min Ave Max <br />Static Water Level Feet 93.80 93.81 94.03 93.89 94.03 <br />Water Elevation Feet 6686.5 6686.7 6686.7 6686.61 6686.47 <br />Temperature Celsius <br />Conductivity umhos/cm <br />pH su <br />Field Comments D Dry <br />L <br />Barame <br />UNITS <br />Bicarbonate m 2 <br />Carbonate m 2 <br />Chloride mglL <br />Conductivi umhos/cm <br />Hardness mg/L <br />pH su <br />ResidueFilterable-TDS mg/L <br />ResidueNonFilterable-TS m 2 <br />SAR <br />Sulfate m /L <br />Calcium (Dissolved) m /L <br />Magnesium (Dissolved) m /L <br />Sodium (Dissolved) m /L <br />Potassium m 2 <br />TDS Ratio (gray./talc.) <br />The area o/ concern for monioring point B06 was affected by the mining operation before Bs establishment. Therefore, <br />all recorded monitoring events are considered Operational. <br />Borehole B-6 is located ups/ope of the reclaimed waste disposal pile and is monitored for interface seepage <br />in connection with slope and waste pile stability. Borehole B-6 is dry. <br />Ground Water <br />• <br />• <br />• <br />There is no baseline cellection possible (or points initiated after fhe influence Ot mining. <br />Figure No. 7 <br />