Laserfiche WebLink
<br /> <br />~ ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-32.5-] 16(3)(x), on the anniversary date of the permit each year. <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land. <br />reclamation accomplished to date an'd during the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during [he upcoming year. Please attach such <br />a report and map [o enclosed annualreport form. (An adequately labeled map that clearly delineates and includes <br />the above elernents may suffice for a written report.) <br />If your operation is subject to the pr I visions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-], 407-4, and Rules <br />1.13.7(1)(x): <br />(i) tF~e condition of [he opei anon at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, perfi~rmance <br />standards and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of ring operations. <br />Please provide: the additional following information with your Annual Report, as applicable: <br />i <br />(a) Prr the requirements of ~2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per [he requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(x), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />v <br /> <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules l.l~(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />- _ _ _- _. __ ; ~and_the_yalue of the property-sub;ect to.either9f,these instruments. -The report shall also provide - _ <br />proof that there are rio past-due properly taxes. <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, [he operator shall have the bank provide documentation in [he form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of <br />Credit does not exceed [en percent (I09o) of the bank's capital surplus accounts. <br />(ii) Per the require Vents of Z CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any~fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2~ CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note ttia[ if you are not a Designated Mining Operation, you will no[ have an Environmental Protection <br />Plan as part of your approved permit.) <br />~, <br />