My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP11881
DRMS
>
Back File Migration
>
Report
>
REP11881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:42:52 PM
Creation date
11/27/2007 12:47:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
3/12/2001
Doc Name
2000 ARR & AHR TEXT
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Results <br />The 2000 survey monument information, certifications and piezometer well information is provided <br />in Exhibit 6, Section 16 Excess Spoil Fill. The location of the survey monuments and monitor well <br />is shown on the Exhibit 9 - 2000 Annual Report Map. <br />1. Survey Monuments -The survey information consists of the survey of the four monuments <br />accompanied with corresponding diagrams to provide an analysis of the results. The surveys <br />indicate the Fill has settled from 1.08 feet to 2.165 feet with a corresponding lateral movement of <br />0.32 feet to 0.946 feet. The data suggests nothing more than the anticipated amount of settling and <br />consolidation of the Fill. <br />2. Piezometer, Well -The piezometer well was established in late 1994. A water level had <br />originally been detected at the 60-foot depth, corresponding to the level at which the drill <br />penetrated consolidated material underlying the rock drain. We interpreted the water level to be <br />located at the interface of the bottom of the rock drain and the underlying strata. Subsequent <br />monitoring in 1999 has shown the water level to remain consistently in the 58 to 59.1 foot depth <br />range. The data suggests that there is no development of a perched water zone within the Fill. <br />3. No springs or seeps have been noted associated with the Fill. <br />In summary, the monitoring suggests that, during 2000, no significant changes have occurred in the <br />• Section 16 Fill and the Fill is performing according to the approved design. <br />C. West Pit Fill <br />Requirements <br />The West Pit Fill is presently under construction. All construction reports and quarterly <br />Certifications aze to be forwarded to the Division quarterly until construction is completed. Nine <br />survey monuments have been installed and Colowyo has committed to quarterly monitoring. The <br />piezometer well was installed on June 25, 1996 and the completion report forwazded to the <br />Division. The piezometer well will be monitored quarterly. All monitoring reports are also to be <br />submitted to the Division in the Annual Reclamation Reports. <br />During 1999 Colowyo received approval of Technical Revision 48 to modify the footprint of the <br />Fill. The change was made necessary to 1) modify the placement of fill to avoid azeas of instability <br />in adjacent natural hillslopes of the E. Taylor draw and 2) to correct a computer generated error in <br />the postmining topography. The 2000 construction of the Fill proceeded in accordance with the <br />revised plan. <br />Results <br />I Copies of the construction reports and certifications are found in Exhibit 7. The reports indicate the <br />• construction of the Fill is proceeding according to the approved plan. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.